Construction sequence and methods

  • Midline hanging: the paving area shall be divided into four parts, a cross line shall be painted in the center of paving ground, and the center shall be marked with ink or chalk; the angle of midline cross shall be 90 degrees; corridor, exit and other high walking frequency place shall taken non-cutting construction scheme.
  • Binder coating: after choosing a 1/4 area, the binder coating shall be according to the schedule. The coating shall take special square carpet binder and implement at the center of the carpet.

Carpet construction: the construction shall be started from the center in the direction of “L” shape. The center line is the standard of comprehensive construction, therefore, the parallel and right angle shall be confirmed; “L” shape pavement can confirm the accuracy of center line and the problem of slant can be easily found and corrected. After the completion of one 1/4 area, the construction of the remaining parts shall use the same method.

  • The crisscross method and direction accordance method are suggested for the pavement.

Wall surface carpet clipping (finished carpet clipping)

The carpet clipping near the wall shall be 1mm less than actual size, so the installation shall be easier.

The scribing and cutting shall be on the back of carpet after size measure.

Construction inspection items of different ground

  • Plastic floor blocks: the damaged parts shall be replaced or made flat, and the surface shall be clean.
  • Wood board: the surface shall be cleaned and uneven parts or pits shall be filled.
  • Floor tiles, marble board: the damaged or irregular parts shall be flattened, and all the chemicals shall be cleaned.
  • The other special places (staircase, entrance): entrance, ladder, slope, bearing surface, and walking place have to be stuck with binder to prevent from the shift of backlog.